Denver Agency Company
Back to case studies

Denver Agency Company

A pipe break on the second level resulted in significant water damage.

Location

Aurora, CO 80014

Date

December 20–21, 2024

Scope

Water Loss & Asbestos Abatement

Project Summary

A pipe break on the second level resulted in significant water damage. Ceiling tested positive for >1% asbestos-containing material (ACM). Full containment under negative pressure was established. Abatement procedures followed with the safe removal of 550 sq ft of textured ACM. Location: Aurora, CO 80014 Date: December 20–21, 2024 Scope: Water Loss & Asbestos Abatement

This case study was migrated from the current ACES website as part of the Atlas recovery effort so the new site preserves real project evidence instead of generic filler copy.

Available Now

Have a project with similar risk, timing, or compliance requirements?

Atlas can review the scope and help you understand the containment, abatement, demolition, or restoration path before work begins.

24/7 Emergency Response
Veteran-Owned & Certified
Colorado-Compliant Abatement